Actions

Work Header

INCIDENT LOG – 10/27/2018 - PCS-06

Summary:

Another old story of mine, this time an incident log of the largest catastrophe in Cloaker Corporation's history

Work Text:

INCIDENT LOG – 10/27/2018 - PCS-06 

BEGIN LOG 

7:02 AM – Normal shift change in security personnel occurs, with a 5-minute difference in each sector. 

7:11 AM – Surface Power Plant reports nominal readings, SCRAM test is scheduled for 12:15 PM the same day. 

7:30 AM – SYNTAX runs site status check. 

7:34 AM – Security Personnel assigned to the Medium Containment Zone are briefed on the upcoming test. 

7:35 AM – SYNTAX reports relay fault within the Reality Anchors containing Anomaly-005 “The Mechanical Artist” 

7:45 AM – Maintenance Team B is dispatched to repair the Reality Anchors. 

8:52 AM – The Deputy Chief of Security, Assistant Research Director, and an ERMA Senior Coordinator enter the site via helicopter. 

9:00 AM – Research Subjects are gathered by Security Personnel and briefed for testing. Researchers are enroute to the RSHZ. 

9:15 AM – Research Subjects, Security Personnel, and Researchers are assembled and assigned the designation “Testing Team Alpha” Team consists of 6 Research Subjects, 3 Researchers, and 4 Security Officers. 

9:36 AM – Senior Officer J. Richards, Research Assistant R. Mobele, and Technician K. Logan all simultaneously report feelings of nausea, lightheadedness, and body aches. All report to the on-site infirmary. 

9:38 AM – Testing Team Alpha reaches the high security transit hub. 

9:42 AM – Maintenance Team B reports inability to repair the Reality Anchors with current resources, reports that mineral components of such are severely damaged. 

9:59 AM – Transportation Authority reports tram delays due to routine maintenance on tram lines C3, H8, A1, and F6. 

10:12 AM – Testing Team Alpha reaches the Medium Containment Zone. 

10:17 AM – Testing Team Alpha reaches the containment chamber of Anomaly-005, Maintenance Team has vacated the area. 

10:18 AM – Senior Technician R. Johnson advises against testing on Anomaly-005 while the Reality Anchors are non-functional. 

10:20 AM – Research Board Officer [REDACTED] orders the test to continue, regardless of the technician’s advisory. 

10:21 AM – The Assistant Research Director, Deputy Chief of Security, and ERMA Senior Coordinator sit down for a meeting within the Administrative Sector meeting room A1. 

10:23 AM – Test commences. 

10:24 AM - [REDACTED] 

10:25 AM – Security Officers report an explosion within the Medium Containment Zone. 

10:26 AM – SYNTAX reports multiple containment breaches within the Medium Containment Zone. 

10:26 AM – Security Teams B, G, and M are dispatched to the Medium Containment Zone. 

10:28 AM – Maintenance teams report significant damage to the fire suppression systems and utility tram lines. 

10:29 AM – Fire is reported via SYNTAX within the Medium Containment Zone and the Logistics hub. Evacuation is halted by the Containment Breaches. 

10:29 AM – Containment Breaches have been reported to affect the majority of the sectors connected to the High Security Transit Hub. 

10:30 AM – Site Director M. Cunningham initiates code Lithium Blue throughout the site. 

10:31 AM – On-site control room staff initiate several emergency measures to attempt a quarantine of the breaches. 

10:31 AM – Collapse of the administration sector results in the death of all in Meeting Room A1 except for the Assistant Director of Research. 

10:33 AM – Security Radio is cleared via interception from on-site dispatch. Orders are given to reinforce strategic areas and evacuate staff to appropriate shelters. 

10:34 AM – SRU Operatives arrive to the Heavy Containment zone and set up a perimeter. 

10:37 AM – A riot is declared in the RSHZ, attempts to contact the assigned security detail are met with no response. 

10:38 AM – Security teams are deployed to strategic areas but stretched thin. Response forces stop being referred to as “Medics” and “Security,” but rather “Aid” and “Firepower.” 

10:40 AM – Anomalies are reported as far deep as the Research Sector. 

10:41 – Evacuation Shelter 04 within the Research Sector is compromised by Anomalies, all inside are reported KIA. 

10:42 AM – The Site Director initiates a full lockdown of all shelters, locking at least 37 people outside of them. 

10:45 AM – Surface Power Plant is placed into lockdown, the reactor reduces power production to prepare for possible SCRAM activation. 

10:46 AM – Site Director M. Cunningham requests aid from ERMA operatives to handle the situation. 

10:47 AM – All contact with the Heavy Containment Zone has been lost. 

10:52 AM – Security Officers inbound to the Medium Containment Zone report that shots were fired at their tram from the RSHZ. 

10:59 AM – Contact is established between AD-Hoc Security Team Juliet and a group of survivors trapped behind rubble. A radio is thrown to the other side. 

11:02 AM – ERMA Operatives from the Security Strike Team arrive and establish a base of command around the primary entrance to the site. 

11:14 AM – Manual data cord is run between the On-Site control room and the Field Base. 

11:17 AM – Two teams of 6 Security Strike Team Operatives each split up and clear the surface power plant. All low-ranking employees are detained or terminated. 

11:19 AM – SRT Operatives land at the Field Base on the surface. 

11:24 AM – SRT Operatives descend into the site. An armored vehicle is constructed for each 3-man team entering the site. 

11:26 AM – SYNTAX Reports significant fire damage to the medium containment zone. 

11:28 AM – Security Team Juliet and the trapped survivors are freed and begin making their way towards the tram line. 

11:30 AM – Infirmary reports it is at maximum capacity and cannot treat any more victims. 

11:31 AM – Security Team Juliet and the survivors are killed by a ceiling turret and tesla gate during their attempted escape. 

11:34 AM – SRT Squad Alpha reports the road to the Heavy Containment Zone is blocked by rubble. They then re-route to the RSHZ. 

11:35 AM – A small team of SRU Operatives successfully extract with 21 survivors in tow. 

11:37 AM – SRT Squad Echo is reported KIA due to anomalies. 

11:41 AM – SRT Squad Bravo is reported KIA due to anomalies. 

11:45 AM – SRT Squad Charlie reported KIA due to anomalies. 

11:47 AM – SRT Squad Alpha reported KIA due to anomalies. 

11:52 AM – Response Coordinator and Site Director order full evacuation of all personnel not in an evacuation shelter. 

11:53 AM - 12:15 PM – Over 700 casualties reported during panicked evacuation of the site. 

12:16 PM – Omega Warhead protocol initiated. 

12:28 PM – Omega Warhead protocol completes. PCS-07 is destroyed. 

12:30 PM – High-ranking personnel are extracted from the site. 

12:45 PM – Agents of the Paranormal Services arrive on site. 

1:00 PM – Site decommissioned.